Sunday, December 28, 2008

Sooo.... What have we been up to?

We're sure you have been wondering what we've been doing the last few months since the blog was updated. Well, . . .


We worked on the garden
(don't forget to click on the pics to enlarge)



adding to the squash and melons we had already grown


In addition to what is shown, we have blackeyed peas, lima beans, mangos, pumpkins, avocados, sugar cane, and lots of lizards, frogs and iguanas




A day's pick

Saturday, December 27, 2008

Not your mother's QVC . . .


We've been on a shopping binge, purchasing generators,


commercial stoves,

indoor and outdoor lighting,


and ceiling fans, among other equipment
Posted by Picasa

Details, details...


We went to the mainland



and began research,



with George's invaluable input,



on tile . . .

Posted by Picasa

Drying in


George routed the edges of all the rafters and grooved the tops for wiring,



the roofing materials were carried up the hill,



the wiring was pulled for the third floor ceiling lights and fans, and



the decking was completed


Posted by Picasa

Plumbing


We laid out the ever-important septic


broke ground



and began the arduous task of hand digging it


Posted by Picasa

Second floor forms


We built the form



for the second floor walkway and landing


and poured it

Posted by Picasa

Let there be stairs . . .


The forms for the first floor landing were installed


Canelo supervised


The steps were formed after the landing was poured


And, Voila! We have a roof and steps to the second floor!

Posted by Picasa

Third floor work


We built third floor walls



installed the rafters for the roof


received the insulation and zinc from the freight boat




and had it brought to our dock along with more sand and gravel



Posted by Picasa

Vaulted ceilings


All the third floor rooms will have vaulted ceilings


We built a large cupola in the gameroom for airflow


Once the temporary support boards are removed we will install a large ceiling fan in the cupola



The insulation and zinc was put down on the decking



Posted by Picasa

Plaster work


We plastered walls


inside and out


and finished the upper walls on the third floor
Posted by Picasa

Front yard coming along


We worked on the front yard



adding terracing, trees and flowers

Posted by Picasa

Curbside parking (not)


We created a mooring for the Miss G by cutting a large buttonwood trunk and taking it out in the bight,





jetting it down until




just the "Y" at the top of the trunk was out of the sand, and





connecting a tag line and marking it with a flag to create a mooring for the boat in anticipation of "winter weather"


Posted by Picasa